Site visit, drove last two Pile Get link Facebook X Pinterest Email Other Apps July 26, 2017 Contractor was ready to start driving at 7am. Last two drove good, drove to solid rock Get link Facebook X Pinterest Email Other Apps Comments
Site visit, Poured West Approach Slab September 05, 2017 Contractor was ready to pour Approach slab on West side. Concrete arrived at 2:20, I tested concrete: Slump 31/2", Air 5.5%, Temp 69°. Made four cylinders, pour went good. Read more