Site visit-Pile driving

 Contractor was ready to drive test pile when Leif arrived at 10:00, contractor drove the two test pile. They drove good, contractor continued to drive the rest of the piling.




Contractor had to weld pile to drive the last two pile, they will drive them in the morning.